By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy for more information.

Upper Mugu Karnali Hydroelectric Project

Sector
Power Generation Plant
Country
Nepal
Stage
Development
Status
Self-Assessed
Asset
Hydro Power Plant
Sector
Power Generation Plant
Country
Nepal
Stage
Development
Status
Self-Assessed

What’s a Rich Text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in one place instead of having to add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!

  • A rich text element can be used with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content, add a rich text field to any collection and then connect a rich text element to that field in the settings panel. Voila!
    • test
  • t to that field
  • t to that field

How to customize formatting for each rich text

How to customize formatting for each rich text
How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the rich text element using the "When inside of" nested selector system.

Located in Mugu District of Western Nepal, as per the study license,  Upper Mugu Karnali Hydroelectric Project (UMKHEP)  is a 6 hours peaking project of 306 MW  . Under Golyan Group,  Elevate Energy Pvt Ltd (EEPL) is developing the Project. Currently, EEPL has been conducting the Updated Feasibility, Detailed Engineering Design, Tender Document Preparation and ESIA works of UMKHEP by involving German Consultant - Lahmeyer International GmbH. Lahmeyer currently has been studying the project as a 4.20 peaking hours 191.4 MW project. The reduction in project potential is subjected to reduced water availability compared to previous studies based on field measurements.

Heading