The Tila-2 Hydropower Project (Tila-2 HPP) is a strategically significant 420 MW Peaking Run-of-River development currently in its pre-development stage. It is situated in Tila Gufa Rural Municipality of Kalikot District, within Nepal’s Karnali Province.
Tila-2 HPP is designed to harness a catchment area of 2649.731 km² and a gross head of 596.00 m. The project also benefits from considerable locational and infrastructural advantages. The site is accessible through an all-weather blacktop road, facilitating logistics and year-round construction activity. A nearby 33 kV transmission line provides a viable source of construction power, while the under-construction Phukot Hub, located about 15 kilometers from the site, offers a planned grid connection point for evacuation of generated power.
Currently under pre-development, the project has completed feasibility assessments and permitting processes and is now advancing into engineering design and supplementary technical studies, which will inform subsequent development phases.